Prime Minister Narendra Modi has inaugurated Pune Metro Line 3 and laid the foundation stone for four new corridors under Phase II, taking the value of the metro projects launched to around Rs 21,800 crore. The projects are aimed at strengthening connectivity across Pune’s major IT, residential and commercial hubs.
The 23-km Line 3, also known as the Pink Line, has been developed at a cost of over Rs 8,300 crore. It connects Maan to District Court Metro station, linking the Hinjawadi IT hub with Shivajinagar and improving access to one of Pune’s key employment centres.
The corridor will be operated entirely by women train operators, while around 30% of its electricity requirements are envisaged to be met through solar power. It has been developed under the Public-Private Partnership (PPP) model.
The Prime Minister also laid the foundation stone for Pune Metro Phase II, estimated to cost around Rs 13,500 crore. The expansion comprises four corridors:
- Line 2A: Vanaz to Chandani Chowk
- Line 2B: Ramwadi to Vitthalwadi
- Line 4: Kharadi to Khadakwasla
- Line 4A: Nal Stop to Manik Baug
Together, the new corridors will improve connectivity to important locations such as Kharadi, Magarpatta, Hadapsar, Swargate, Manik Baug, Nanded City, Pune Cantonment and Warje. The network will also integrate with existing metro services and intercity bus facilities through interchange points.
The expansion is expected to improve access to employment and business districts, reduce dependence on private vehicles and strengthen public transport capacity across the Pune Metropolitan Region.
The projects form part of Maharashtra’s wider metro infrastructure expansion. Addressing the event, Modi noted that the state’s operational metro network had grown from around 10–11 km in 2014 to nearly 175 km, with more than 680 km under construction.

