The XGC150-IA crawler cranes of XCMG (SHE:000425) deployed to the construction project of Mumbai Trans Harbour Link (“MTHL”) project, the longest cross-sea bridge in India that will connect Mumbai with its satellite city Navi Mumbai, delivered exceptional performance, significantly contributing to the development of the project. As per reports, the project has reported that it has finished 84 per cent of the construction and projects it will be completed by the end of 2023.
The 21.8 km bridge is constituted of a 16.5 km bridge over the sea and 5.5 km viaduct on land. Upon completion, the bridge will reduce the travelling time between Mumbai and Navi Mumbai from two hours to 20 minutes, accelerating transportation, logistics and economic activities significantly to promote local economic development for lifting capability, operation manoeuvrability and transportation accessibility of the hoisting equipment MTHL project had strict requirements.
Mason Meng, XCMG Crawler Crane India Regional Product Manager said, “In the future, XCMG will continue to optimise our sustainable products and green construction solutions, bringing more ‘Advanced and Endurable’ equipment products to create values for customers and build a better future for society”.