MMRDA advances Atal Setu–Mumbai–Pune Expressway connector with strong construction progress

MMRDA advances Atal Setu–Mumbai–Pune Expressway connector with strong construction progress

Mumbai Metropolitan Region Development Authority is progressing steadily on the Atal Setu–Mumbai–Pune Expressway connector, a 7.35 km, six-lane elevated corridor designed to facilitate seamless and signal-free travel between Mumbai and…

comments off
Mumbai 3.0 gains traction as MMRDA secures 216 acres in Raigad growth corridor

Mumbai 3.0 gains traction as MMRDA secures 216 acres in Raigad growth corridor

Mumbai Metropolitan Region Development Authority has taken a significant step forward in advancing the Mumbai 3.0 vision by aggregating 216 acre of land in the Pen growth corridor of Raigad…

comments off
MMRDA Clears Over Rs 12,000 Crore Projects to Fast-Track Metro Expansion Across Mumbai

MMRDA clears over Rs 12,000 crore projects to fast-track metro expansion across Mumbai

Mumbai Metropolitan Region Development Authority (MMRDA) has sanctioned projects exceeding Rs 12,000 crore aimed at accelerating the city’s Metro development and enhancing integrated transit systems. This major approval—finalised during the…

comments off
Maharashtra is set to enhance regional connectivity with a new 20-km access-controlled highway linking Mumbai, Navi Mumbai, and Badlapur.

Maharashtra plans 20-km access-controlled highway to link Mumbai, Navi Mumbai, and Badlapur

In a strategic move to ease congestion and enhance travel efficiency, the Maharashtra State Government is planning a new 20-km, eight-lane access-controlled highway to improve connectivity between Mumbai, Navi Mumbai,…

comments off

You cannot copy content of this page